New Parking Lot Layout and Fire Lanes in Maxwell, TX
A first striping on fresh concrete: 522 linear feet of stall lines, 720 linear feet of red fire lane curb with stencils, and two accessible stalls.
What We Did
This property was brand new, with fresh concrete, new landscaping, and no markings at all, so the whole lot needed a first layout. Most of the work was fire lane: the curbs wrap around landscaped islands and long curving drives, and every one of them needed to read clearly as a fire lane.
We cleaned the new concrete first, then painted 720 linear feet of red fire lane curb and stenciled FIRE LANE and NO PARKING in white along the route. In the parking areas, we striped 522 linear feet of stall lines, two accessible stalls with blue symbols, and a crosshatched access aisle between them.
Curved curbs take more time than straight runs, because the paint has to follow the curb face cleanly through every bend. Taking that time is what allows the fire lane to look like part of the design instead of something painted on afterward.
Services on This Job
Project Details
- Location
- Maxwell, TX
- Completed
- September 2026
- Property
- Newly built property
- Work
- New layout
Scope
- Stall lines
- 522 linear feet
- Fire lane
- 720 linear feet
- Accessible stall symbols
- 2
- Access aisles
- 1
Finished Work






Other Recent Jobs

Parking Garage Restripe in San Antonio
A full restripe of a covered parking garage: 2,592 linear feet of stall lines, 20 directional arrows, 20 COMPACT stencils, and fresh accessible stalls.
View Project
Fire Lane and New Layout for a Leasing Office in San Antonio
A new layout for a residential community leasing office: 396 linear feet of stall lines, 345 linear feet of fire lane with stencils, and two accessible stalls, striped after dark.
View ProjectReady to Transform Your Parking Lot?
Get a free, no-obligation quote today. We respond within 24 hours.